Why data centre equipment needs a different freight approach
Data centre builds and upgrades combine two pressures that don't usually appear together in the same shipment: the equipment is often physically heavy and awkward, transformers, switchgear, cooling plant, server racks, while also being electronically sensitive to shock, vibration and, in some cases, moisture and static. A freight approach built purely around weight and dimensions misses the handling requirements; one built purely around fragility misses the structural loading requirements. Both have to be planned together.
