Charter aircraft departing at first light for a crew rotation
    24/7 Operations Desk · Active Now

    FIFO & Workforce · Scheduling

    FIFO Roster and Charter Schedule Planning

    A rotation that arrives an hour late costs a shift. A rotation that departs an hour early costs a night's accommodation. Schedule design is where FIFO charter either saves money or quietly leaks it.

    Already have an RFQ prepared? Email charters@aviall.com.au

    Shift-aligned
    Departure windows
    Back-to-back
    Rotation planning
    Duty-aware
    Crew limits respected
    24/7
    Charter desk

    Start from the shift, not the flight

    The only date and time that genuinely matters in FIFO scheduling is when the crew must be usable on site, pre-start, induction, or the first shift of the swing. Everything else works backwards from that: ground transfer time from the aerodrome, arrival buffer, sector length, check-in and screening at the origin, and the departure slot that makes it all fit.

    Working forwards from a convenient departure time is how programs end up delivering crews mid-morning on a day shift, paying for accommodation the night before, or running two aircraft where one properly timed rotation would have done.

    • On-site usable time, the fixed anchor
    • Ground transfer and site induction time at the far end
    • Sector length plus a realistic arrival buffer
    • Check-in, screening and manifest close at the origin
    • Resulting departure window, then aircraft and operator suitability

    Swing patterns and rotation frequency

    Australian resource rosters cluster around recognisable patterns, even-time arrangements such as two-and-two, longer swings such as eight-and-six or fourteen-and-fourteen, and compressed patterns for specialist or shutdown work. Each produces a different flight frequency and a different concentration of demand on particular days.

    The scheduling consequence is that swing-change days carry double load: one crew out, one crew in. A well-designed program uses that, running back-to-back rotations so the aircraft carries the outbound crew home on the return leg instead of flying empty. That single decision often changes cost per seat more than any rate negotiation.

    • Even-time patterns produce steady, predictable weekly frequency
    • Longer swings concentrate demand onto fewer, larger movements
    • Swing-change days should be flown as back-to-back rotations
    • Compressed and specialist rosters usually need ad-hoc capacity alongside the program

    Crew duty, curfews and the constraints you cannot negotiate

    Flight crew duty limits are regulatory, not commercial. An early departure and a late return on the same day may exceed what one crew can legally operate, which means either a second crew, a crew overnight at one end, or a schedule adjustment. Knowing this early avoids a program being priced on a schedule that cannot be flown.

    Airport curfews and operating hours matter at both ends. Perth is curfew-free, which is a genuine advantage for pre-dawn departures; several east coast and regional airports are not, and some remote strips are daylight-only or have no lighting at all, which puts a hard boundary on arrival and departure times.

    • Flight and duty time limits, including standby and overnight requirements
    • Origin and destination curfews and published operating hours
    • Daylight-only strips and lighting availability at remote aerodromes
    • Ground handling and screening availability at the hours you need
    • Wet-season and weather serviceability in northern regions

    Peak periods, shutdowns and schedule integrity

    Shutdowns, turnarounds and major project phases pull hundreds of extra people into a region inside narrow windows, and that demand lands on the same routes at the same hours as everyone else's. A program schedule that is comfortable in steady state can be genuinely tight during peak season.

    The practical approach is to protect the base pattern with contracted capacity and layer additional rotations over it for the peak, rather than trying to squeeze surge demand into the existing schedule. Share peak dates as early as they are known, availability during shutdown season is a real constraint, not a negotiating position.

    Manifests and day-of-operation control

    Schedules survive contact with reality through manifest discipline. A clear manifest deadline, a single nominated site contact per rotation, and an agreed process for late changes and no-shows keep the aircraft departing on time with the right people aboard.

    When something moves, weather, serviceability, a failed fitness-for-work check, a delayed contractor mobilisation, the important thing is a named charter manager with authority to re-plan, on a desk staffed 24 hours. Programs do not fail because disruptions happen; they fail because nobody is accountable when they do.

    • Agreed manifest format, deadline and change process
    • One nominated site contact per rotation
    • Documented no-show and late-arrival handling
    • Named charter manager and 24/7 escalation path
    • Periodic review of on-time performance against shift-change windows

    What we plan around your roster

    Backwards scheduling

    Rotations built from on-site usable time, not from a convenient slot.

    Back-to-back rotations

    Swing-change days flown in both directions to avoid empty legs.

    Duty-aware planning

    Schedules checked against crew duty limits before they are priced.

    Curfew and daylight checks

    Operating hours and lighting confirmed at both ends.

    Peak layering

    Surge rotations added over a protected base pattern.

    Manifest discipline

    Deadlines, change handling and no-show process agreed up front.

    FIFO & workforce charter

    Have a FIFO requirement?

    Send us the requirement.

    We take both recurring programs and one-off movements. Estimates are enough to start. We come back with aircraft options, capacity and baggage feasibility, and indicative pricing you can put in front of a budget holder or a tender response.

    Recurring charter program

    Roster flying, workforce rotations, seasonal campaigns and scheduled corporate shuttles. Send the pattern and we price the program, not just a single flight.

    • 01OriginCrew source city or port
    • 02DestinationSite aerodrome or nearest town
    • 03Passenger countPer rotation, and peak numbers
    • 04Days of operatione.g. Monday and Thursday
    • 05Required departure timesOutbound and return windows
    • 06Program commencementFirst flight date, even approximate
    • 07Program duratione.g. 12 months, or campaign length
    • 08BaggageChecked allowance, tooling, freight in hold
    • 09FrequencyRotations per week or per swing
    • 10Additional requirementsRunway, compliance, aircraft preference
    Submit FIFO requirement

    One-off group movement

    A single group flight, a team, a tour, a conference, a delegation, an event crew or a shutdown surge. Five details are usually enough for a workable quote.

    • 01Origin and destinationAirports or cities
    • 02Passenger countPlus any staff or officials travelling
    • 03Dates and timesDeparture, return, and how fixed they are
    • 04BaggageChecked bags, sports gear, equipment, instruments
    • 05Group typeCorporate, sports, tour, event, government, education
    Request group charter quote

    Urgent charter? Our ops desk is staffed 24/7.

    Aircraft options within the hour and a written quote with an indicative wheels-up window.

    Schedule planning, quick reference

    Fixed anchor
    Time the crew must be usable on site
    Best efficiency lever
    Back-to-back rotations on swing-change days
    Hard constraints
    Crew duty limits, curfews, daylight-only strips
    Peak handling
    Contracted base pattern plus layered surge rotations
    Manifest control
    Agreed deadline, single site contact, change process
    Review cadence
    On-time performance and load factor reviewed periodically

    FAQ

    Frequently Asked Questions

    Work backwards from on-site usable time: add site induction and ground transfer, sector length, an arrival buffer, then check-in and screening at the origin. On typical Perth-to-site sectors that often lands on a pre-dawn departure, which is why curfew-free origins matter.

    Have a roster pattern that needs a schedule built around it?

    Send origin, destination, passenger numbers, frequency, days and required times, program duration, baggage and start date. We will build a workable schedule and price the pattern.

    Have a live requirement?

    Send us the roster pattern, ports and headcount. We return a schedule and pricing basis. Attach an existing RFQ, packing list or photos straight from your phone, partial detail is enough to start.

    Requirement

    FIFO / Workforce

    AttachmentsRoster patterns, tender documents or an existing RFQ. Files up to 20MB each, 10 max. PDF, Word, Excel, CSV, images or email files.

    Goes straight to our charter desk at Charters@Aviall.com.au. Submitting an RFQ does not confirm an aircraft.